Estimated Times for Plan Review
Click on a date to
see the estimated completion dates for submitted plans.
|
For plans submitted the week of
Monday, September 17, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
10 |
weeks, or the week of |
November 26, 2007 |
| Expedite |
3 |
weeks, or the week of |
October 8, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
October 1, 2007 |
| |
| Sprinkler |
Standard |
6 |
weeks, or the week of |
October 29, 2007 |
| Expedite |
3 |
weeks, or the week of |
October 8, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
September 24, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
October 29, 2007 |
| Expedite |
5 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
October 1, 2007 |
| |
| Hazardous Materials & Other |
Standard |
24 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
1 |
weeks, or the week of |
September 24, 2007 |
| Resubmittal |
16 |
weeks, or the week of |
January 7, 2008 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
January 28, 2008 |
| Expedite |
3 |
weeks, or the week of |
October 8, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
October 29, 2007 |
| |
|
For plans submitted the week of
Monday, September 24, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
11 |
weeks, or the week of |
December 10, 2007 |
| Expedite |
2 |
weeks, or the week of |
October 8, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
October 15, 2007 |
| |
| Sprinkler |
Standard |
5 |
weeks, or the week of |
October 29, 2007 |
| Expedite |
3 |
weeks, or the week of |
October 15, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
October 1, 2007 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
November 12, 2007 |
| Expedite |
5 |
weeks, or the week of |
October 29, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
October 15, 2007 |
| |
| Hazardous Materials & Other |
Standard |
22 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
2 |
weeks, or the week of |
October 1, 2007 |
| Resubmittal |
16 |
weeks, or the week of |
January 14, 2008 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
February 4, 2008 |
| Expedite |
3 |
weeks, or the week of |
October 15, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
November 5, 2007 |
| |
|
For plans submitted the week of
Monday, October 1, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
9 |
weeks, or the week of |
December 3, 2007 |
| Expedite |
1 |
weeks, or the week of |
October 8, 2007 |
| Resubmittal |
4 |
weeks, or the week of |
October 29, 2007 |
| |
| Sprinkler |
Standard |
6 |
weeks, or the week of |
November 12, 2007 |
| Expedite |
3 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
October 8, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
November 12, 2007 |
| Expedite |
3 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
November 12, 2007 |
| |
| Hazardous Materials & Other |
Standard |
20 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
1 |
weeks, or the week of |
October 8, 2007 |
| Resubmittal |
8 |
weeks, or the week of |
November 26, 2007 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
February 11, 2008 |
| Expedite |
3 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
November 12, 2007 |
| |
|
For plans submitted the week of
Monday, October 8, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
10 |
weeks, or the week of |
December 17, 2007 |
| Expedite |
1 |
weeks, or the week of |
October 15, 2007 |
| Resubmittal |
4 |
weeks, or the week of |
November 5, 2007 |
| |
| Sprinkler |
Standard |
5 |
weeks, or the week of |
November 12, 2007 |
| Expedite |
3 |
weeks, or the week of |
October 29, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
October 15, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
November 12, 2007 |
| Expedite |
2 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
October 22, 2007 |
| |
| Hazardous Materials & Other |
Standard |
24 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
2 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
9 |
weeks, or the week of |
December 10, 2007 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
3 |
weeks, or the week of |
October 29, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
November 19, 2007 |
| |
|
For plans submitted the week of
Monday, October 15, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
10 |
weeks, or the week of |
December 24, 2007 |
| Expedite |
1 |
weeks, or the week of |
October 22, 2007 |
| Resubmittal |
4 |
weeks, or the week of |
November 12, 2007 |
| |
| Sprinkler |
Standard |
5 |
weeks, or the week of |
November 19, 2007 |
| Expedite |
3 |
weeks, or the week of |
November 5, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
October 22, 2007 |
| |
| Fire Alarm |
Standard |
5 |
weeks, or the week of |
November 19, 2007 |
| Expedite |
2 |
weeks, or the week of |
October 29, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
October 29, 2007 |
| |
| Hazardous Materials & Other |
Standard |
20 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
2 |
weeks, or the week of |
October 29, 2007 |
| Resubmittal |
9 |
weeks, or the week of |
December 17, 2007 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
3 |
weeks, or the week of |
November 5, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
November 26, 2007 |
| |
|
For plans submitted the week of
Monday, October 22, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
12 |
weeks, or the week of |
January 14, 2008 |
| Expedite |
2 |
weeks, or the week of |
November 5, 2007 |
| Resubmittal |
4 |
weeks, or the week of |
November 19, 2007 |
| |
| Sprinkler |
Standard |
5 |
weeks, or the week of |
November 26, 2007 |
| Expedite |
3 |
weeks, or the week of |
November 12, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
November 5, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
December 3, 2007 |
| Expedite |
3 |
weeks, or the week of |
November 12, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
November 12, 2007 |
| |
| Hazardous Materials & Other |
Standard |
20 |
weeks, or the week of |
March 10, 2008 |
| Expedite |
2 |
weeks, or the week of |
November 5, 2007 |
| Resubmittal |
9 |
weeks, or the week of |
December 24, 2007 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
3 |
weeks, or the week of |
November 12, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
December 3, 2007 |
| |
|
For plans submitted the week of
Monday, October 30, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
12 |
weeks, or the week of |
January 22, 2008 |
| Expedite |
2 |
weeks, or the week of |
November 13, 2007 |
| Resubmittal |
4 |
weeks, or the week of |
November 27, 2007 |
| |
| Sprinkler |
Standard |
6 |
weeks, or the week of |
December 11, 2007 |
| Expedite |
3 |
weeks, or the week of |
November 20, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
November 13, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
December 11, 2007 |
| Expedite |
4 |
weeks, or the week of |
November 27, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
November 13, 2007 |
| |
| Hazardous Materials & Other |
Standard |
22 |
weeks, or the week of |
April 1, 2008 |
| Expedite |
2 |
weeks, or the week of |
November 13, 2007 |
| Resubmittal |
7 |
weeks, or the week of |
December 18, 2007 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
March 11, 2008 |
| Expedite |
3 |
weeks, or the week of |
November 20, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
December 11, 2007 |
| |
|
For plans submitted the week of
Monday, November 5, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
12 |
weeks, or the week of |
January 28, 2008 |
| Expedite |
3 |
weeks, or the week of |
November 26, 2007 |
| Resubmittal |
5 |
weeks, or the week of |
December 10, 2007 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
December 24, 2007 |
| Expedite |
3 |
weeks, or the week of |
November 26, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
November 26, 2007 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
December 24, 2007 |
| Expedite |
4 |
weeks, or the week of |
December 3, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
November 19, 2007 |
| |
| Hazardous Materials & Other |
Standard |
28 |
weeks, or the week of |
May 19, 2008 |
| Expedite |
3 |
weeks, or the week of |
November 26, 2007 |
| Resubmittal |
7 |
weeks, or the week of |
December 24, 2007 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
3 |
weeks, or the week of |
November 26, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
December 17, 2007 |
| |
|
For plans submitted the week of
Monday, November 12, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
13 |
weeks, or the week of |
February 11, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 3, 2007 |
| Resubmittal |
7 |
weeks, or the week of |
December 31, 2007 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
December 31, 2007 |
| Expedite |
3 |
weeks, or the week of |
December 3, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
December 3, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
December 24, 2007 |
| Expedite |
3 |
weeks, or the week of |
December 3, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
November 26, 2007 |
| |
| Hazardous Materials & Other |
Standard |
14 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 3, 2007 |
| Resubmittal |
9 |
weeks, or the week of |
January 14, 2008 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 3, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
December 24, 2007 |
| |
|
For plans submitted the week of
Monday, November 19, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
13 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 10, 2007 |
| Resubmittal |
7 |
weeks, or the week of |
January 7, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
January 7, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 10, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
December 10, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
December 31, 2007 |
| Expedite |
3 |
weeks, or the week of |
December 10, 2007 |
| Resubmittal |
2 |
weeks, or the week of |
December 3, 2007 |
| |
| Hazardous Materials & Other |
Standard |
14 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 10, 2007 |
| Resubmittal |
9 |
weeks, or the week of |
January 21, 2008 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
March 31, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 10, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
December 31, 2007 |
| |
|
For plans submitted the week of
Monday, November 26, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
15 |
weeks, or the week of |
March 10, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 17, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
January 7, 2008 |
| |
| Sprinkler |
Standard |
10 |
weeks, or the week of |
February 4, 2008 |
| Expedite |
4 |
weeks, or the week of |
December 24, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
December 17, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
January 7, 2008 |
| Expedite |
4 |
weeks, or the week of |
December 24, 2007 |
| Resubmittal |
3 |
weeks, or the week of |
December 17, 2007 |
| |
| Hazardous Materials & Other |
Standard |
14 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 17, 2007 |
| Resubmittal |
9 |
weeks, or the week of |
January 28, 2008 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
April 7, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 17, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
January 7, 2008 |
| |
|
For plans submitted the week of
Monday, December 3, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
14 |
weeks, or the week of |
March 10, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 24, 2007 |
| Resubmittal |
5 |
weeks, or the week of |
January 7, 2008 |
| |
| Sprinkler |
Standard |
10 |
weeks, or the week of |
February 11, 2008 |
| Expedite |
4 |
weeks, or the week of |
December 31, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
December 10, 2007 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
January 14, 2008 |
| Expedite |
4 |
weeks, or the week of |
December 31, 2007 |
| Resubmittal |
4 |
weeks, or the week of |
December 31, 2007 |
| |
| Hazardous Materials & Other |
Standard |
24 |
weeks, or the week of |
May 19, 2008 |
| Expedite |
8 |
weeks, or the week of |
January 28, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
March 24, 2008 |
| |
| Fire Protection Reports |
Standard |
19 |
weeks, or the week of |
April 14, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 24, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
January 14, 2008 |
| |
|
For plans submitted the week of
Monday, December 10, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
14 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 31, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
December 17, 2007 |
| |
| Sprinkler |
Standard |
8 |
weeks, or the week of |
February 4, 2008 |
| Expedite |
5 |
weeks, or the week of |
January 14, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
December 17, 2007 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
January 28, 2008 |
| Expedite |
5 |
weeks, or the week of |
January 14, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
December 24, 2007 |
| |
| Hazardous Materials & Other |
Standard |
24 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
8 |
weeks, or the week of |
February 4, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
March 31, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 31, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
January 21, 2008 |
| |
|
For plans submitted the week of
Monday, December 17, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
9 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 7, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
December 31, 2007 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
February 4, 2008 |
| Expedite |
5 |
weeks, or the week of |
January 21, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
December 24, 2007 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
February 11, 2008 |
| Expedite |
6 |
weeks, or the week of |
January 28, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
January 7, 2008 |
| |
| Hazardous Materials & Other |
Standard |
23 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
8 |
weeks, or the week of |
February 11, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
April 7, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
March 10, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 7, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
January 28, 2008 |
| |
|
For plans submitted the week of
Monday, December 24, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
9 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 14, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
January 7, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
February 11, 2008 |
| Expedite |
5 |
weeks, or the week of |
January 28, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
December 31, 2007 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
6 |
weeks, or the week of |
February 4, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
January 14, 2008 |
| |
| Hazardous Materials & Other |
Standard |
23 |
weeks, or the week of |
June 2, 2008 |
| Expedite |
8 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
April 14, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 14, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
February 4, 2008 |
| |
|
For plans submitted the week of
Monday, December 10, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
14 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 31, 2007 |
| Resubmittal |
1 |
weeks, or the week of |
December 17, 2007 |
| |
| Sprinkler |
Standard |
8 |
weeks, or the week of |
February 4, 2008 |
| Expedite |
5 |
weeks, or the week of |
January 14, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
December 17, 2007 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
January 28, 2008 |
| Expedite |
5 |
weeks, or the week of |
January 14, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
December 24, 2007 |
| |
| Hazardous Materials & Other |
Standard |
24 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
8 |
weeks, or the week of |
February 4, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
March 31, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
3 |
weeks, or the week of |
December 31, 2007 |
| Resubmittal |
6 |
weeks, or the week of |
January 21, 2008 |
| |
|
For plans submitted the week of
Monday, December 31, 2007
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
9 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 21, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
January 14, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
February 18, 2008 |
| Expedite |
5 |
weeks, or the week of |
February 4, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
January 7, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
6 |
weeks, or the week of |
February 11, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
January 21, 2008 |
| |
| Hazardous Materials & Other |
Standard |
23 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
8 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
April 21, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 21, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
February 11, 2008 |
| |
|
For plans submitted the week of
Monday, January 7, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
9 |
weeks, or the week of |
March 10, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 28, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
January 21, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
5 |
weeks, or the week of |
February 11, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
January 14, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
6 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
January 28, 2008 |
| |
| Hazardous Materials & Other |
Standard |
23 |
weeks, or the week of |
June 16, 2008 |
| Expedite |
8 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
16 |
weeks, or the week of |
April 28, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
March 31, 2008 |
| Expedite |
3 |
weeks, or the week of |
January 28, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
February 18, 2008 |
| |
|
For plans submitted the week of
Monday, January 14, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
12 |
weeks, or the week of |
April 7, 2008 |
| Expedite |
5 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
February 4, 2008 |
| |
| Sprinkler |
Standard |
6 |
weeks, or the week of |
February 25, 2008 |
| Expedite |
4 |
weeks, or the week of |
February 11, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
January 21, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
March 3, 2008 |
| Expedite |
5 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
February 4, 2008 |
| |
| Hazardous Materials & Other |
Standard |
35 |
weeks, or the week of |
September 15, 2008 |
| Expedite |
2 |
weeks, or the week of |
January 28, 2008 |
| Resubmittal |
21 |
weeks, or the week of |
June 9, 2008 |
| |
| Fire Protection Reports |
Standard |
4 |
weeks, or the week of |
February 11, 2008 |
| Expedite |
4 |
weeks, or the week of |
February 11, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
January 21, 2008 |
| |
|
For plans submitted the week of
Monday, January 21, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
9 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
6 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
March 3 , 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
March 10, 2008 |
| Expedite |
4 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
January 28, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
5 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
February 18, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
August 25, 2008 |
| Expedite |
4 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
28 |
weeks, or the week of |
August 4, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
2 |
weeks, or the week of |
February 4, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
February 18, 2008 |
| |
|
For plans submitted the week of
Monday, January 28, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
15 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
6 |
weeks, or the week of |
March 10, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
March 10, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
March 17, 2008 |
| Expedite |
4 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
February 25, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
4 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
February 25, 2008 |
| |
| Hazardous Materials & Other |
Standard |
29 |
weeks, or the week of |
August 18, 2008 |
| Expedite |
3 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
24 |
weeks, or the week of |
July 14, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
2 |
weeks, or the week of |
February 11, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
February 25, 2008 |
| |
|
For plans submitted the week of
Monday, February 4, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
3 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
8 |
weeks, or the week of |
March 31, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
March 24, 2008 |
| Expedite |
4 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
February 11, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
March 31, 2008 |
| Expedite |
3 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
February 18, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
September 8, 2008 |
| Expedite |
3 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
13 |
weeks, or the week of |
May 5, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
March 31, 2008 |
| Expedite |
2 |
weeks, or the week of |
February 18, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
March 3, 2008 |
| |
|
For plans submitted the week of
Monday, February 11, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
March 31, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
8 |
weeks, or the week of |
April 7, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
March 31, 2008 |
| Expedite |
4 |
weeks, or the week of |
March 10, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
February 18, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
April 7, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
February 25, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
September 15, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
13 |
weeks, or the week of |
May 12, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
April 7, 2008 |
| Expedite |
2 |
weeks, or the week of |
February 25, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
March 10, 2008 |
| |
|
For plans submitted the week of
Monday, February 18, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
April 7, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 10, 2008 |
| Resubmittal |
8 |
weeks, or the week of |
April 14, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
April 7, 2008 |
| Expedite |
4 |
weeks, or the week of |
March 17, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
February 25, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
April 14, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 10, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
March 3, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
September 22, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 10, 2008 |
| Resubmittal |
13 |
weeks, or the week of |
May 19, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
April 14, 2008 |
| Expedite |
2 |
weeks, or the week of |
March 3, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
March 17, 2008 |
| |
|
For plans submitted the week of
Monday, February 25, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
April 14, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 17, 2008 |
| Resubmittal |
8 |
weeks, or the week of |
April 21, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
April 14, 2008 |
| Expedite |
4 |
weeks, or the week of |
March 24, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
March 3, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
April 21, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 17, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
March 10, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
September 29, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 17, 2008 |
| Resubmittal |
13 |
weeks, or the week of |
May 26, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
April 21, 2008 |
| Expedite |
2 |
weeks, or the week of |
March 10, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
March 24, 2008 |
| |
|
For plans submitted the week of
Monday, March 3, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
April 21, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 24, 2008 |
| Resubmittal |
8 |
weeks, or the week of |
April 28, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
April 21, 2008 |
| Expedite |
4 |
weeks, or the week of |
March 31, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
March 10, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
April 28, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 24, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
March 17, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
October 6, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 24, 2008 |
| Resubmittal |
13 |
weeks, or the week of |
June 2, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
April 28, 2008 |
| Expedite |
2 |
weeks, or the week of |
March 17, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
March 31, 2008 |
| |
|
For plans submitted the week of
Monday, March 10, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
April 28, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 31, 2008 |
| Resubmittal |
8 |
weeks, or the week of |
May 5, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
April 28, 2008 |
| Expedite |
4 |
weeks, or the week of |
April 7, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
March 17, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
May 5, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 31, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
March 24, 2008 |
| |
| Hazardous Materials & Other |
Standard |
31 |
weeks, or the week of |
October 13, 2008 |
| Expedite |
3 |
weeks, or the week of |
March 31, 2008 |
| Resubmittal |
13 |
weeks, or the week of |
June 9, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
May 5, 2008 |
| Expedite |
2 |
weeks, or the week of |
March 24, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
April 7, 2008 |
| |
|
For plans submitted the week of
Monday, March 17, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
7 |
weeks, or the week of |
May 5, 2008 |
| Expedite |
4 |
weeks, or the week of |
April 14, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
April 28, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
May 5, 2008 |
| Expedite |
5 |
weeks, or the week of |
April 21, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
April 7, 2008 |
| |
| Fire Alarm |
Standard |
8 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
5 |
weeks, or the week of |
April 21, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
April 7, 2008 |
| |
| Hazardous Materials & Other |
Standard |
28 |
weeks, or the week of |
September 29, 2008 |
| Expedite |
6 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
22 |
weeks, or the week of |
August 18, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
2 |
weeks, or the week of |
March 31, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
April 14, 2008 |
| |
|
For plans submitted the week of
Monday, March 24, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
8 |
weeks, or the week of |
May 19, 2008 |
| Expedite |
5 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
April 14, 2008 |
| |
| Sprinkler |
Standard |
8 |
weeks, or the week of |
May 19, 2008 |
| Expedite |
5 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
March 31, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
9 |
weeks, or the week of |
May 26, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
April 21, 2008 |
| |
| Hazardous Materials & Other |
Standard |
11 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
4 |
weeks, or the week of |
April 21, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
April 14, 2008 |
| |
| Fire Protection Reports |
Standard |
12 |
weeks, or the week of |
June 16, 2008 |
| Expedite |
2 |
weeks, or the week of |
April 7, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
May 5, 2008 |
| |
|
For plans submitted the week of
Monday, March 31, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
8 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
4 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
April 28, 2008 |
| |
| Sprinkler |
Standard |
8 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
5 |
weeks, or the week of |
May 5, 2008 |
| Resubmittal |
1 |
weeks, or the week of |
April 7, 2008 |
| |
| Fire Alarm |
Standard |
6 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
4 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
April 28, 2008 |
| |
| Hazardous Materials & Other |
Standard |
8 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
4 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
April 21, 2008 |
| |
| Fire Protection Reports |
Standard |
10 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
2 |
weeks, or the week of |
April 14, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
April 28, 2008 |
| |
|
For plans submitted the week of
Monday, April 7, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
4 |
weeks, or the week of |
May 5, 2008 |
| Expedite |
2 |
weeks, or the week of |
April 21, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
May 5, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
6 |
weeks, or the week of |
May 19, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
April 21, 2008 |
| |
| Fire Alarm |
Standard |
9 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
6 |
weeks, or the week of |
May 19, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
May 5, 2008 |
| |
| Hazardous Materials & Other |
Standard |
5 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
4 |
weeks, or the week of |
May 5, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
May 5, 2008 |
| |
| Fire Protection Reports |
Standard |
10 |
weeks, or the week of |
June 16, 2008 |
| Expedite |
2 |
weeks, or the week of |
April 21, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
May 5, 2008 |
| |
|
For plans submitted the week of
Monday, April 14, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
4 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
2 |
weeks, or the week of |
April 28, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
May 12, 2008 |
| |
| Sprinkler |
Standard |
8 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
6 |
weeks, or the week of |
May 26, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
April 28, 2008 |
| |
| Fire Alarm |
Standard |
5 |
weeks, or the week of |
May 19, 2008 |
| Expedite |
6 |
weeks, or the week of |
May 26, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
May 5, 2008 |
| |
| Hazardous Materials & Other |
Standard |
6 |
weeks, or the week of |
May 26, 2008 |
| Expedite |
5 |
weeks, or the week of |
May 19, 2008 |
| Resubmittal |
6 |
weeks, or the week of |
May 26, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
5 |
weeks, or the week of |
May 19, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
April 28, 2008 |
| |
|
For plans submitted the week of
Monday, April 21, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
3 |
weeks, or the week of |
May 12, 2008 |
| Expedite |
2 |
weeks, or the week of |
April 5, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
May 12, 2008 |
| |
| Sprinkler |
Standard |
8 |
weeks, or the week of |
June 16, 2008 |
| Expedite |
5 |
weeks, or the week of |
May 26, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
May 5, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
6 |
weeks, or the week of |
June 2, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
May 5, 2008 |
| |
| Hazardous Materials & Other |
Standard |
6 |
weeks, or the week of |
June 2, 2008 |
| Expedite |
4 |
weeks, or the week of |
May 19, 2008 |
| Resubmittal |
4 |
weeks, or the week of |
May 19, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
June 16, 2008 |
| Expedite |
5 |
weeks, or the week of |
May 26, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
May 5, 2008 |
| |
|
For plans submitted the week of
Monday, May 12, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
4 |
weeks, or the week of |
June 9, 2008 |
| Expedite |
2 |
weeks, or the week of |
May 26, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
June 2, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
June 30, 2008 |
| Expedite |
5 |
weeks, or the week of |
June 16, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
May 26, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
June 30, 2008 |
| Expedite |
6 |
weeks, or the week of |
June 23, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
May 26, 2008 |
| |
| Hazardous Materials & Other |
Standard |
7 |
weeks, or the week of |
June 30, 2008 |
| Expedite |
6 |
weeks, or the week of |
June 23, 2008 |
| Resubmittal |
7 |
weeks, or the week of |
June 30, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
July 7, 2008 |
| Expedite |
5 |
weeks, or the week of |
June 16, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
May 26, 2008 |
| |
|
For plans submitted the week of
Monday, May 19, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
4 |
weeks, or the week of |
June 16, 2008 |
| Expedite |
2 |
weeks, or the week of |
June 2, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
June 9, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
July 7, 2008 |
| Expedite |
5 |
weeks, or the week of |
June 23, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 2, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
July 7, 2008 |
| Expedite |
6 |
weeks, or the week of |
June 30, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 2, 2008 |
| |
| Hazardous Materials & Other |
Standard |
7 |
weeks, or the week of |
July 7, 2008 |
| Expedite |
6 |
weeks, or the week of |
June 30, 2008 |
| Resubmittal |
7 |
weeks, or the week of |
July 7, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
July 14, 2008 |
| Expedite |
5 |
weeks, or the week of |
June 23, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 2, 2008 |
| |
|
For plans submitted the week of
Monday, May 26, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
4 |
weeks, or the week of |
June 23, 2008 |
| Expedite |
2 |
weeks, or the week of |
June 9, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
June 16, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
Junly 14, 2008 |
| Expedite |
5 |
weeks, or the week of |
June 30, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 9, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
Junly 14, 2008 |
| Expedite |
6 |
weeks, or the week of |
July 7, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 9, 2008 |
| |
| Hazardous Materials & Other |
Standard |
7 |
weeks, or the week of |
July 14, 2008 |
| Expedite |
6 |
weeks, or the week of |
July 7, 2008 |
| Resubmittal |
7 |
weeks, or the week of |
July 14, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
July 21, 2008 |
| Expedite |
5 |
weeks, or the week of |
June 30, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 9, 2008 |
| |
|
For plans submitted the week of
Monday, June 2, 2008
|
|
|
|
|
| Plan Type |
Review Type |
Estimated
Completion Date |
| Civil/Other |
Standard |
4 |
weeks, or the week of |
June 30, 2008 |
| Expedite |
2 |
weeks, or the week of |
June 16, 2008 |
| Resubmittal |
3 |
weeks, or the week of |
June 23, 2008 |
| |
| Sprinkler |
Standard |
7 |
weeks, or the week of |
July 21, 2008 |
| Expedite |
5 |
weeks, or the week of |
July 7, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 16, 2008 |
| |
| Fire Alarm |
Standard |
7 |
weeks, or the week of |
July 21, 2008 |
| Expedite |
6 |
weeks, or the week of |
July 14, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 16, 2008 |
| |
| Hazardous Materials & Other |
Standard |
7 |
weeks, or the week of |
July 21, 2008 |
| Expedite |
6 |
weeks, or the week of |
July 14, 2008 |
| Resubmittal |
7 |
weeks, or the week of |
July 21, 2008 |
| |
| Fire Protection Reports |
Standard |
8 |
weeks, or the week of |
July 28, 2008 |
| Expedite |
5 |
weeks, or the week of |
July 7, 2008 |
| Resubmittal |
2 |
weeks, or the week of |
June 16, 2008 |
| |
|
| |
| |
|
|
| |
|
|